Documents

S.NO

Service Name or Document Name

DETAIL

1

Detailed Project Report (DPR)

Seamlessly initiate the process with a complete and accurate application.

2

Land Ownership Documents

Confirm your legal rights with ownership or lease agreements.

3

Site Plan/Layout

Present a clear, professional plan of your infrastructure

4

Environmental Management Plan (EMP)

Demonstrate your commitment to sustainable practices with an EMP.

5

No Objection Certificate (NOC)

Obtain vital clearances from local authorities.

6

Water and Energy Requirements

Highlight resource needs and sustainability efforts.

7

Effluent Treatment Plan

Outline your approach to managing wastewater efficiently.

8

Air Pollution Control Details

Showcase strategies for minimizing air pollution.

9

Hazardous Waste Management Plan

Detail safe practices for handling hazardous waste.

10

Environmental Clearance

If applicable, secure approvals for eco-sensitive projects.

11

Manufacturing Process Flowchart

Provide a clear process overview to enhance transparency.

12

Undertaking or Declaration

Assure compliance with environmental norms through an affidavit.

13

Authorization Certificate:

Establish credibility with business registration documents.

S.NO

Service Name or Document Name

DETAIL

1

CTE Approval Letter

Showcase your proactive compliance by including the Consent to Establish approval.

2

Compliance Report

Highlight your adherence to the conditions specified in the CTE

3

Environmental Monitoring Data

Provide recent data on air, water, and noise quality to demonstrate your eco-friendly practices.

4

Effluent and Emission Analysis Report

Verified reports showcasing efficient waste and emissions management.

5

Details of Pollution Control Equipment

Share specifications and operational status of pollution control systems.

6

Hazardous Waste Management Details

Ensure safety and compliance by detailing your hazardous waste handling procedures.

7

Solid Waste Management Plan

Outline sustainable methods for managing non-hazardous waste.

8

Water Consumption and Effluent Disposal Plan

Present transparent data on water use and treatment methods.

9

Site Inspection Report

Ensure confidence with a detailed report of site readiness and infrastructure.

10

Undertaking or Declaration

A commitment to operate responsibly and adhere to environmental regulations.

11

Authorization Certificates

Valid business registrations such as GST, MSME, or Factory Licenses.

S.NO

Service Name or Document Name

DETAIL

1

Consent to Operate (CTO)

Proof of operational compliance with environmental standards from the State Pollution Control Board.

2

Site Layout Plan

A detailed layout showcasing the storage, treatment, and disposal areas for hazardous waste.

3

Process Flow Diagram

A clear description of manufacturing processes, highlighting hazardous waste generation points.

4

Hazardous Waste Management Plan

Comprehensive details on waste collection, segregation, storage, transportation, treatment, and disposal practices.

5

Agreement with Authorized TSDF/Recycler

A formal agreement with a Treatment, Storage, and Disposal Facility (TSDF) or authorized recycler for safe disposal or recycling of hazardous waste.

6

Environmental Monitoring Data

Latest data on air, water, and soil quality, ensuring compliance with pollution control norms.

7

Annual Returns or Records

Previous records, if applicable, of hazardous waste generation and disposal in Form 4.

8

Emergency Preparedness Plan

Documented safety measures and plans to handle accidents involving hazardous waste.

9

Authorization Certificates

Copies of business registration certificates such as GST, MSME, or Factory License.

10

Undertaking or Affidavit

A self-declaration ensuring compliance with Hazardous Waste Management Rules.

11

Proof of Ownership or Lease Agreement

Documents proving legal possession of the site.

S.NO

Service Name or Document Name

DETAIL

1

Project Report

A detailed project report specifying the purpose and requirement of water abstraction, including consumption details.

2

Land Ownership Proof

Documents proving ownership of the land or a lease agreement, if applicable.

3

Consent to Establish (CTE) and Consent to Operate (CTO)

Copies of approvals from the Haryana State Pollution Control Board (HSPCB).

4

Water Balance Sheet

A detailed report showing water inflow, usage, recycling, and outflow.

5

Groundwater Recharge Plan

 Plans for recharging groundwater as part of sustainable water usage practices.

6

Borewell Details

Details of existing or proposed borewells, including location, depth, and capacity.

7

Flow Meter Installation Proof

Evidence of flow meter installation for monitoring water abstraction.

8

Environmental Clearance (if applicable)

For projects that require prior environmental clearance.

9

NOC from Local Authorities

 No Objection Certificate from the local governing body for water abstraction.

10

Site Layout Plan

A detailed map indicating the location of borewells and water storage facilities.

11

Affidavit or Undertaking

 A declaration of adherence to groundwater abstraction guidelines and sustainable practices.

12

Water Testing Reports

Latest test report on water quality to ensure it meets safety and usage standards.

13

Authorization Certificates

Valid business registration documents like GST, MSME, or Factory Licenses.

Contact Us

Let’s build a greener future together — reach out to us today.